Graco 313876F Uživatelský manuál Strana 27

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 44
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 26
Operation
313876F 27
Operation
The operation of the PD44 metering valve is controlled
by an external source. If a PD44 Control Box was pur-
chased, see the PD44 Control Box manual for operation
instructions. See Related Manuals on page 3.
Sequence of Operation
Step 1: Reload
Spools shift to the right
Material feed inlets are opened
Materials are transferred into the metering cham-
bers by a pressurized feed system
Outlet ports are blocked
Metering rods are retracted to a precise position
determining the volume of each material
Step 2: Shift
The balanced spool assemblies shift to the dis-
pense position
Material path to the mixer inlet is opened
Material feed inlet ports are blocked
Metering rods remain in the retracted position
Step 3: Dispense
Metering rods extend
A and B materials are simultaneously dispensed
from the metering chamber into the disposable
mixer
A and B materials are dispensed at the predeter-
mined volume ratio.
Upon completion of the dispense stroke, the metering
rod and spool assemblies shift back to the reload posi-
tion.
Zobrazit stránku 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 43 44

Komentáře k této Příručce

Žádné komentáře